An aluminium heat emission plate — grooved to hold hydronic pipe — is fixed along timber joists, or on battens over Hebel Powerfloor. Pipe is laid, connected to the manifold and pressure tested, then your chosen flooring installs directly over the top. It’s a set-and-forget system: switch it on for the cold season, off when it ends.